Tag: Steel Authority of India Limited

  • India is going ‘Atmanirbhar’ direction for wheels of Vande Bharat trains: Resources

    By way of PTI

    NEW DELHI: The Railways has roped within the Metal Authority of India Restricted and the Rashtriya Ispat Nigam Ltd to fabricate wheels for Vande Bharat Categorical trains, assets mentioned Tuesday.

    In step with them, the transfer is geared toward making sure that 2.5 lakh wheels for the 400 Vande Bharat Categorical trains, to be produced over the following 3 years, don’t seem to be not on time.

    The Metal Authority of India Restricted’s (SAIL) Durgapur Metal Plant has already produced 45,000 solid wheels for the Railways’ LHB coaches and can now use the licensed design to fabricate the wheels of the Vande Bharat Categorical trains, a supply mentioned.

    Additionally, state-owned metal maker the Rashtriya Ispat Nigam Ltd (RINL) will even manufacture solid wheels at its Rae Bareli unit in Uttar Pradesh for the high-speed trains.

    It has already manufactured round 700 such wheels, however now they are going to be aware of the Vande Bharat design type.

    “Those devices had been already making solid wheels, however they didn’t have the capability to fabricate such a lot of within the period of time we would have liked.”

    “Even now, they’re our backup with wheels coming in from different international locations as smartly. We wish to make sure that there aren’t any delays,” mentioned the supply.

    The RINL unit in Rae Bareli has a manufacturing capability of 1 lakh items of solid wheels according to annum, assets mentioned.

    Cast wheels are made from a big cast piece of metal which is heated at excessive temperatures and pressurised to take form.

    This thermal cycle guarantees that solid wheels are more potent than different sorts and are fitted in trains which run at a velocity of over 100 kmph, assets mentioned.

    To be in a position within the subsequent 3 years, the Railways has additionally ordered wheels from Malaysia, the USA and China.

    A Rs 170-crore gentle for 39,000 cast solid wheels (tough grew to become) was once awarded to TZ (Taizhong) Hong Kong Global Ltd closing month, officers mentioned.

    The 128 wheels wanted for the rigors of 2 trains to be carried out in August had been airlifted from Romania to Chennai after which despatched to Hyderabad lately.

    Resources mentioned the Railways could also be within the strategy of tying up with forging companies to expedite the method of producing wheels.

    Within the Union Finances for 2022-2023, Finance Minister Nirmala Sitharaman had proposed that 400 new Vande Bharat trains be advanced and manufactured over the following 3 years.

    The objective is to roll out 75 such trains via August 15, 2023, consistent with a timeline introduced via Top Minister Narendra Modi.