Tag: namami gange project news

  • Hamirpur: 355 villages gets blank consuming water from Namami Gange venture, understand how a long way the paintings has reached in Hamirpur

    Hamirpur: The manager frame right here has began arrangements to offer consuming water to greater than 350 villages during the Namami Gange venture in Hamirpur district of Uttar Pradesh. In step with the senior officer related to the venture, by way of subsequent month about 1.25 lakh households will get started getting consuming water from this venture. Pipelines have additionally been laid to offer water to the entire villages coming underneath the venture. In Hamirpur district, other people have been suffering with a significant water downside in masses of villages for many years. Particularly in dozens of rugged villages of Maudaha space and Sumerpur, Kurara, Muskara, Gohand and Rath spaces, there’s hue and cry a number of the other people for water. Hundreds of other people have to stroll a number of kilometers to get consuming water throughout the summer time. In regards to the severe water downside within the Bundelkhand area, the Central Executive has given a large reward of the Namami Gange venture underneath the Water Venture.

    In Hamirpur district too, the manager frame has now stepped up arrangements to saturate greater than 350 villages with water thru a venture value six and a part billion. ADM Namami Gange Rajesh Kumar Yadav mentioned that for water provide in 148 villages of Maudaha and Sumerpur blocks, Patyora Danda Village Crew Ingesting Water Scheme at the banks of Yamuna river has price Rs 336.98 lakh. On this, greater than 65 % paintings has been executed. It used to be knowledgeable that development of 1 consumption pipe, 45 MLD water remedy plant and 46 over head tanks are being executed at a quick tempo. It used to be knowledgeable that with the exception of this, the paintings of village crew consuming water venture costing Rs 242.65 lakh is being executed at a quick tempo in Haraulipur of Kurara block of the district. Thru this venture, with the exception of 39 villages of Kurara block, other people can even get consuming water in 168 villages of Muskara, Rath, Gohand and Sarila blocks. Right here too, development of 123 over head tanks, 8 MLD water remedy plant, 9 MLD consumption smartly and 12 over head tanks is being finished.
    From subsequent month, a couple of lakh other people gets water. ADM Namami Gange Rajesh Kumar Yadav mentioned that underground pipelines had been put in within the villages proposed within the six and a part billion venture. Thus far, connections for water provide have additionally been given to about 65 thousand homes. Instructed that the manager frame has made arrangements to begin water provide in the entire villages by way of subsequent month. Checking out is being executed for this. The minor deficiencies discovered throughout trying out are being got rid of.

    The venture will quench the thirst of the villagers in the summertime season
    Billions of consuming water venture will end up to be a milestone for this problematic villages of Bundelkhand. Lakhs of other people, who’ve been going through water scarcity for many years, gets aid from this downside this summer time. ADM Namami Gange informed that this time other people may not be stricken by way of the issue of consuming water within the villages throughout the summer time, as a result of sooner than that greater than 1 lakh other people of 355 villages within the district will get started getting natural consuming water.
    Document – Pankaj Mishra