Kanpur: The paintings of the second one section of the Kanpur Metro challenge has began. UPMRC Performing MD Sushil Kumar began digging underground metro tunnel through urgent the button of TBM system. Underground metro may have 7 metro stations. There will probably be 4 metro stations from Chunniganj to Nayaganj. The paintings of which began from Monday. Several types of difficulties must be confronted within the building of underground metro. For this, groups of mavens have additionally come from out of the country. The workforce of mavens will steadily observe the paintings.
Two machines named Nana and Tatya have come
Two machines named Nana and Tatya have come for the excavation of underground metro tunnel. A system named Nana will dig underground. After this Tatya System will do the paintings of creating the tunnel. Kanpur Metro Venture is 23 km lengthy. It’s been focused to attach Kanpur IIT to Naubasta, whilst the underground tunnel will probably be 4 km lengthy.
UPMRC will meet the cruel goal
In keeping with Sushil Kumar, performing MD of UPMRC, a brand new bankruptcy is starting within the historical past of Kanpur. UP Metro is beginning underground tunneling paintings from Monday. The tunneling system was once taken down and the chopping paintings has been began from lately. Our workforce has were given an excessively difficult goal. After Lucknow, the paintings of Kanpur Metro has grow to be the quickest.
Particular consideration will probably be given to safety
MD Sushil Kumar mentioned that our goal is to finish the underground segment. TBM system will do the chopping paintings for six months. The underground segment may have 4 metro stations. Running on underground tunnel is difficult. Our workforce is doing very low tunneling, so a large number of protection is looked after. In keeping with most people, there must be no affect at the higher facet. He advised that many mavens have come from out of doors international locations, who will observe this paintings. We will be able to dig 10 meters an afternoon. Tunneling paintings is going on with protection. It’s our enterprise that through March 2024, the metro will probably be passed over to the folk of the town.
Document – Sumit Sharma, Kanpur