Categorical Information Provider
MUMBAI: Forward of the BMC elections, to nook Uddhav Thackeray, the Maharashtra deputy leader minister Devendra Fadnavis tabled the CAG record in Maharashtra state legislative meeting on Saturday and highlighted a chain of irregularities and loss of transparency within the Rs 12,023 crore price of labor tenders issued by way of the 9 departments of the BMC.
Maharashtra deputy leader minister Devendra Fadnavis who may be finance minister stated that the CAG record is solely tailer, the findings of the experiences printed that there’s inconceivable and rampant corruption in BMC and malafide intentions can’t be dominated out as smartly.
He stated that the CAG performed the audit of best non-pandemic paintings orders and tasks from November 2019 to June 2022.
“If we stock out the audit of the entire paintings performed by way of the BMC, then many sudden and surprising issues will pop out within the public area. On the other hand, as in step with custom, we will desk the CAG record within the Space immediately however definitely learn out some sudden findings of the audit record as in step with the call for of the Space. Then, I will be able to refer this report back to the scrutiny committee and it’ll be tabled within the Space,” Devendra Fadnavis added.
Devendra Fadnavis studying out hanging options of the audit record stated BMC unusually awarded the 20 works of 2 BMC departments price t Rs 214.48 crore with out inviting tenders which is in opposition to the provisions of the handbook of procurement of BMC and established vigilance pointers.
He stated the contract agreements weren’t performed between the contractors and BMC in 64 works costing Rs 4,755.94 crore around the 5 civic departments.
“The CAG said there may be loss of transparency in BMC tendering and mission paintings, there’s a systematic drawback in all departments, casualness in paintings and mismanagement of fund allocations by way of the BMC,” said within the record.
“Within the absence of formal agreements, BMC would no longer have the ability to take any felony recourse in opposition to the contractors, within the tournament of default at the a part of the contractors. Additionally, in 13 works costing Rs 3,355.57 crore throughout 3 departments, third-party auditors weren’t appointed to determine the standard/amount of works performed by way of the contractors,” he reads out.
The finance minister additional stated, they’ll communicate with leader minister Eknath Shinde and can come to a decision whether or not those irregularities in BMC-awarded mission works must be investigated or no longer and if sure, then in which company?
Political observers stated that the BMC elections is also declared anytime due to this fact the BJP is making ready a way to goal and nook Uddhav Thackeray by way of the use of the CAG record and its irregularities and dangerous that those tasks will also be probed by way of the central businesses like ED as smartly. “However the BJP forgot that the individuals who performed the paintings and who dominated the BMC as status committee chairman and key corporators, all of them are with Maharashtra CM Eknath Shinde led Shiv Sena, so it’ll be attention-grabbing to look how the BMC handled this tough factor,” he added.
BOX
Division-wise findings of the CAG record
Well being Division
• Development of Underneath Graduate/ Put up Graduate Hostel Tower in KEM Health facility with out permission of respective district Collector. Therefore a fantastic of Rs 2.70 crores was once imposed.
Mithi River Air pollution Keep watch over
• In July 2019, BMC made up our minds to award 4 other works to 4 other contractors inside a length of 24 months however in fact, all 4 works had been allocated to just one contractor.
Malad Influent pumping station
• Paintings price Rs 464.72 crores to ineligible tenderers
• Ineligibility for 3 years however the truth
• Malafide intentions can’t be dominated out. CAG noticed
Forged Waste Control
• World Soft – Waste to Power 3000 Lots / In step with Day Capability.
• This situation was once greater to 600 tonnes/day.
• Might. Chennai MSW Pvt. Ltd. was once given the process.
• Paintings price Rs.648 crores
• Fee of 49.12 crores thus far
• Deficient tracking by way of BMC for ordinary delays in acquiring the required clearances is more likely to have a vital affect at the mission supply agenda.
Land
32,394.90 sq. meters of land in Dahisar (reserved for lawn/ playground/ maternity house as in step with D.P. 1993).
• BMC’s solution of acquisition in December 2011.
• Ultimate Land Acquisition Review: Rs 349.14 Crore.
• 716 % greater than 12 months 2011 review
• Encroachment in this web page.
• Now the monetary burden on rehabilitation is Rs 77.80 crore.
• It’s more likely to building up additional.
• This fund has no get advantages to BMC.
Division of Data Era
• SAP implementation: A freelance price Rs159.95 crore was once awarded to the former contractor with out inviting tenders.
• Might SAP India Ltd. He was once paid Rs 37.68 crore in step with annum for upkeep. However there aren’t any services and products in go back, it is a palpable loss.
• Dealing with contract, and gentle procedure with the similar SAP.
• 2019 forensic audit experiences severe scope for manipulation – however no motion on it.
Bridge Department- BMC
• Dr. E Moses Highway and Keshavrao Khade Marg (Mahalakshmi Railway Station)
• Further works with out approval
• Further prefer from BMC to contractor
• Earnings of Rs 27.14 crores in violation of gentle prerequisites.
• Handiest 10 % of the paintings is predicted to be finished by way of sixteenth March, 2022 whilst 50 % of the paintings is predicted to be finished.
Sanjay Gandhi Nationwide Park
4.3 km. Dual Tunnel paintings
• Because of a loss of ultimate approval of the Woodland Division
• Value from Rs 4500 crores to Rs 6322 crores from January 19 to August 2022.
Parel TT Fly Over
• Rs 1.65 crore further paintings with out calling for tenders.
*Gopalkrishna Gokhale Bridge, Andheri*
• Rs 9.19 crore paintings with out gentle
• Rs 15.50 crore was once to be paid for bridge demolition however if truth be told paid 17.49 crore.
Roads and Delivery
• CAG studied the overall 56 works of the street division
• 51 out of 52 works decided on with none survey for Cement concreting paintings
• Works price Rs 54.53 crores had been added to outdated works with out calling for tenders.
• Micro Silica is used as an element for M-40. It’s proven within the invoice. However micro silica price Rs 2.40 crores was once no longer used.
• Handwritten entries had been made within the automatic record.
• Rs 1.26 crores got to the contractors.
MUMBAI: Forward of the BMC elections, to nook Uddhav Thackeray, the Maharashtra deputy leader minister Devendra Fadnavis tabled the CAG record in Maharashtra state legislative meeting on Saturday and highlighted a chain of irregularities and loss of transparency within the Rs 12,023 crore price of labor tenders issued by way of the 9 departments of the BMC.
Maharashtra deputy leader minister Devendra Fadnavis who may be finance minister stated that the CAG record is solely tailer, the findings of the experiences printed that there’s inconceivable and rampant corruption in BMC and malafide intentions can’t be dominated out as smartly.
He stated that the CAG performed the audit of best non-pandemic paintings orders and tasks from November 2019 to June 2022.googletag.cmd.push(serve as() googletag.show(‘div-gpt-ad-8052921-2’); );
“If we stock out the audit of the entire paintings performed by way of the BMC, then many sudden and surprising issues will pop out within the public area. On the other hand, as in step with custom, we will desk the CAG record within the Space immediately however definitely learn out some sudden findings of the audit record as in step with the call for of the Space. Then, I will be able to refer this report back to the scrutiny committee and it’ll be tabled within the Space,” Devendra Fadnavis added.
Devendra Fadnavis studying out hanging options of the audit record stated BMC unusually awarded the 20 works of 2 BMC departments price t Rs 214.48 crore with out inviting tenders which is in opposition to the provisions of the handbook of procurement of BMC and established vigilance pointers.
He stated the contract agreements weren’t performed between the contractors and BMC in 64 works costing Rs 4,755.94 crore around the 5 civic departments.
“The CAG said there may be loss of transparency in BMC tendering and mission paintings, there’s a systematic drawback in all departments, casualness in paintings and mismanagement of fund allocations by way of the BMC,” said within the record.
“Within the absence of formal agreements, BMC would no longer have the ability to take any felony recourse in opposition to the contractors, within the tournament of default at the a part of the contractors. Additionally, in 13 works costing Rs 3,355.57 crore throughout 3 departments, third-party auditors weren’t appointed to determine the standard/amount of works performed by way of the contractors,” he reads out.
The finance minister additional stated, they’ll communicate with leader minister Eknath Shinde and can come to a decision whether or not those irregularities in BMC-awarded mission works must be investigated or no longer and if sure, then in which company?
Political observers stated that the BMC elections is also declared anytime due to this fact the BJP is making ready a way to goal and nook Uddhav Thackeray by way of the use of the CAG record and its irregularities and dangerous that those tasks will also be probed by way of the central businesses like ED as smartly. “However the BJP forgot that the individuals who performed the paintings and who dominated the BMC as status committee chairman and key corporators, all of them are with Maharashtra CM Eknath Shinde led Shiv Sena, so it’ll be attention-grabbing to look how the BMC handled this tough factor,” he added.
BOX
Division-wise findings of the CAG record
Well being Division
• Development of Underneath Graduate/ Put up Graduate Hostel Tower in KEM Health facility with out permission of respective district Collector. Therefore a fantastic of Rs 2.70 crores was once imposed.
Mithi River Air pollution Keep watch over
• In July 2019, BMC made up our minds to award 4 other works to 4 other contractors inside a length of 24 months however in fact, all 4 works had been allocated to just one contractor.
Malad Influent pumping station
• Paintings price Rs 464.72 crores to ineligible tenderers
• Ineligibility for 3 years however the truth
• Malafide intentions can’t be dominated out. CAG noticed
Forged Waste Control
• World Soft – Waste to Power 3000 Lots / In step with Day Capability.
• This situation was once greater to 600 tonnes/day.
• Might. Chennai MSW Pvt. Ltd. was once given the process.
• Paintings price Rs.648 crores
• Fee of 49.12 crores thus far
• Deficient tracking by way of BMC for ordinary delays in acquiring the required clearances is more likely to have a vital affect at the mission supply agenda.
Land
32,394.90 sq. meters of land in Dahisar (reserved for lawn/ playground/ maternity house as in step with D.P. 1993).
• BMC’s solution of acquisition in December 2011.
• Ultimate Land Acquisition Review: Rs 349.14 Crore.
• 716 % greater than 12 months 2011 review
• Encroachment in this web page.
• Now the monetary burden on rehabilitation is Rs 77.80 crore.
• It’s more likely to building up additional.
• This fund has no get advantages to BMC.
Division of Data Era
• SAP implementation: A freelance price Rs159.95 crore was once awarded to the former contractor with out inviting tenders.
• Might SAP India Ltd. He was once paid Rs 37.68 crore in step with annum for upkeep. However there aren’t any services and products in go back, it is a palpable loss.
• Dealing with contract, and gentle procedure with the similar SAP.
• 2019 forensic audit experiences severe scope for manipulation – however no motion on it.
Bridge Department- BMC
• Dr. E Moses Highway and Keshavrao Khade Marg (Mahalakshmi Railway Station)
• Further works with out approval
• Further prefer from BMC to contractor
• Earnings of Rs 27.14 crores in violation of gentle prerequisites.
• Handiest 10 % of the paintings is predicted to be finished by way of sixteenth March, 2022 whilst 50 % of the paintings is predicted to be finished.
Sanjay Gandhi Nationwide Park
4.3 km. Dual Tunnel paintings
• Because of a loss of ultimate approval of the Woodland Division
• Value from Rs 4500 crores to Rs 6322 crores from January 19 to August 2022.
Parel TT Fly Over
• Rs 1.65 crore further paintings with out calling for tenders.
*Gopalkrishna Gokhale Bridge, Andheri*
• Rs 9.19 crore paintings with out gentle
• Rs 15.50 crore was once to be paid for bridge demolition however if truth be told paid 17.49 crore.
Roads and Delivery
• CAG studied the overall 56 works of the street division
• 51 out of 52 works decided on with none survey for Cement concreting paintings
• Works price Rs 54.53 crores had been added to outdated works with out calling for tenders.
• Micro Silica is used as an element for M-40. It’s proven within the invoice. However micro silica price Rs 2.40 crores was once no longer used.
• Handwritten entries had been made within the automatic record.
• Rs 1.26 crores got to the contractors.