SAFF Soccer: Pakistan staff’s arrival behind schedule because of visa factor

Pakistan soccer staff’s arrival right here for the SAFF Soccer Championship has been behind schedule because of a visa factor however the squad is anticipated to achieve in time for its opening fixture in opposition to India on June 21.

Pakistan squad was once anticipated to land in Bengaluru on Sunday after finishing the 4 Country Cup in Mauritius. On the other hand, the staff remains to be in Mauritius, having overlooked the scheduled flight to India this morning.

Pakistan is scheduled to stand India on June 21 on the Sree Kanteerava Stadium at 7.30 PM IST, however a KSFA respectable mentioned there was once no worry in regards to the neighbouring staff’s arrival.

“The India MHA (Ministry of House Affairs) is closed at the weekend and their utility is with the Indian Embassy in Mauritius. We’re involved with the AIFF (All India Soccer Federation), who’s involved with Embassy in addition to the Pakistan Soccer Federation (PFF).

“The phrase coming via that the visa packages of Pakistan gamers will probably be processed on Monday and they’ll be capable of land in Bengaluru on Monday evening or Tuesday morning smartly in time for the fixture,” a best KSFA respectable informed PTI on situation of anonymity.

The PFF had accused the rustic’s Sports activities Board for delaying the NOC for the staff to shuttle to India, whilst the Board retaliated by means of pronouncing that the Federation didn’t put up the paperwork in time.

Pakistan may even face Kuwait (June 24) and Nepal (June 27) of their Team A fits right through the SAFF match.

On the other hand, their preparation for the development was once a ways from preferrred as Pakistan misplaced all their 3 fits within the 4 Country Cup to complete closing at the desk. Djibouti emerged champions within the match held in Mauritius, profitable all 3 in their engagements.