September 23, 2024

The World Opinion

Your Global Perspective

Chhattisgarh goes to get any other Vande Bharat teach – Lok Shakti.in

After the Vande Bharat teach working from Bilaspur to Nagpur, any other Vande Bharat teach goes to fulfill Chhattisgarh. This teach will function between Durg to Raigarh. The verdict to make Durg station as the principle level of recent Vande Bharat teach has been taken by means of South East Central Railway Bilaspur, for this the development of extra pit line within the washing backyard of Durg station has been finished. Within the collection of operation of prime pace trains The state of Chhattisgarh goes to get the reward of any other Vande Bharat Specific teach. South East Central Zone Bilaspur has began arrangements to deliver the brand new Vande Bharat teach again not off course after the sign won from the Railway Board. It’s mentioned that the brand new Vande Bharat teach will run from Durg to Raigarh. On this manner this teach will attach two main towns in Chhattisgarh itself. Lately one Vande Bharat teach is working between Bilaspur to Nagpur. This teach is connecting Chhattisgarh to Maharashtra. It’s being informed that the principle level of the brand new Vande Bharat teach shall be made at Durg station. For this, the fourth pit line has been built on the washing backyard of Durg station. Consistent with the technical necessities of Vande Bharat teach, OHE twine has additionally been drawn within the newly created pit line. Whilst OHE twine has no longer been put in in the rest 3 pit strains and right here diesel locos are introduced for rake washing of passenger trains. In view of the technical drawback in keeping apart the locos of Vande Bharat teach from the rack, the OHE twine has been drawn at the newly created pit line. Consistent with railway assets, the principle level of the proposed Vande Bharat teach shall be Durg station. This teach will depart from Durg within the morning and achieve Raigarh within the afternoon. After staying there for a couple of hours, the fortress will go back until overdue night. After coming to Durg, vital restore paintings together with cleansing and technical checking of Vande Bharat teach rakes shall be performed at the new pit line constructed on the washing backyard. The railway workers who’re to be given duty for the upkeep and service paintings of the racks of this teach were despatched for separate coaching.