Nava Raipur Atal Town Building Authority is undertaking residential survey of the affected villages of Nava Raipur. The survey paintings used to be began from 15 February 2022 as in line with the directions of the Ministerial Committee. For this 7 events have been shaped. Survey complaints were finished in 11 villages of Layer 1 by way of the shaped groups.
In keeping with the tips won from Nava Raipur Atal Nagar Building Authority, the survey listing of 8 out of eleven villages of the affected villages of Atal Nagar Nava Raipur house has been printed for claim-objection to this point. Out of 8 villages, 1648 residential pattas, which might be established on residential land or govt land, were given pattas. In 413 instances, new cord cordon, open land, industrial land like store or lodge or nobody used to be discovered ineligible at the foundation of place of abode and 64 homes are such which might be on personal land. Atal Municipal Building Authority has stated that the allegation being made by way of the Nava Raipur Affected Farmers Welfare Committee that many of the villagers were saved within the ineligible listing, this allegation is baseless.
At the foundation of the 2011 census listing by way of the state govt, the place the citizens are established, the established order is to be given so far as conceivable. At the moment, initial newsletter of survey listing has been achieved in 8 villages. Time frame of 15 days has been given in those instances for declare objection. Subsequently, if there may be any roughly objection within the listing, then the authority can lift an objection within the place of job and after resolving such declare objection, additional motion might be taken.
Like this:
Like Loading…
Proceed Studying