Reduction for two lakh other people of Bundelkhand… Yogi govt launched fund, development of two bridges on Chandrawal river with 18 crores

Hamirpur: Arrangements were made to finish the development of 2 bridges in Hamirpur district of Uttar Pradesh. The development of those bridges must be finished ahead of the Lok Sabha elections. Its call for has been taking place for a very long time. Now the quantity of the plan merchandise has been allotted by way of the Yogi Adityanath govt. Lakhs of other people of the entire villages settled within the rugged for the ultimate a number of a long time gets nice reduction from this. Engineers of the Bridge Company have now made arrangements to build two bridges at two other puts within the Chandrawal river ahead of the Lok Sabha elections. For this, the engineers of the manager frame have additionally sped up the development works of the bridges. Because of this happiness is being noticed in lakhs of villagers.

The Chandrawal river which is available in Maudaha house of ​​Hamirpur district passing thru Birbhoomi Mahoba of Bundelkhand wreaks havoc in the entire villages all over the wet season. Because of the emerging of this river, the touch of greater than a dozen villages is bring to an end from Maudha Tehsil. All of the villages located at the banks of the river turn out to be islands all over floods. A inhabitants of 2 lakhs is affected once a year because of the devastation led to by way of this river all over floods. Because of no bridge within the river, other people move by way of boat. It’s mentioned that this river takes the type of a desolate tract all over the summer time.

Injuries have took place in Chandrawal river
Mahant Ratan Brahmachari, a social employee of Maudaha house and state deputy leader of Shiv Sena, mentioned that the bridge may just no longer be constructed over the Chandrawal river after 75 years of independence. For this time and again the folks of the entire villages had protested. Advised {that a} pregnant lady from Kiswahi village of Sisolar house had long past to the village to get an ambulance. The ambulance was once going from the village to the medical institution by way of crossing the river, when it were given caught in the midst of the river whilst crossing the river. After a number of hours of rescue operation, the ambulance may well be taken out of the river. It was once advised that because of the spate of this river within the wet season many injuries happened wherein many of us have additionally died.

Two bridges being in-built Chandrawal river with Rs 18 crore
A bridge is being built around the Chandrawal river in Chimauli village of the realm at a value of Rs 12.73 crore. For this, the engineers of Setu Nigam have now sped up the development works. JE Rajendra Chowdhary of Setu Nigam mentioned that quickly upon getting the land for the method street, arrangements are directly to assemble the bridge by way of April this yr. Development of a bridge at Chamarkhanna at a value of Rs 5.88 crore is being completed at a quick tempo. Below Engineer of Setu Nigam Chandrapal Diwakar mentioned that once this bridge is able by way of June this yr, it is going to be opened for site visitors. With the development of the bridge, many villages together with Para, Ladar, Himauli might be attached to the Kanpur-Sagar freeway. (File: Pankaj Mishra)