The Narmada Diversion Irrigation Scheme has been built at the Para Narmada drain of Navagaonkhurd village beneath building block Saja of Bemetara district. Chandrashekhar Shivhare, government engineer of the Water Sources Division, mentioned that the space of this irrigation scheme from the district headquarters is 65 km. The designed irrigation capability of the scheme is 975 hectare. Is. The development of this scheme was once began within the yr 1969 and finished in 1970. The catchment house of this scheme is 72 sq km, however because of non-availability of enough water from the catchment house, water needs to be made to be had to this scheme from the proper financial institution canal of Surhi Diversion Scheme. The designed capability of the canals of Narmada Diversion Scheme is 45 cusecs. With the efforts of Agriculture and Water Sources Minister Shri Ravindra Choubey, transforming and lining paintings of canals has been performed to extend its capability to 100 cusecs. After finishing touch of reworking and lining paintings, the designed irrigation capability of this scheme is 975 hectare. In conjunction with 1023 ha. Further irrigation facility may also be supplied. On this approach the overall irrigation capability of the scheme might be 1998. Because of which 16 villages of Navagaon Kala, Patharikala, Bhatgaon, Parpodi, Tiriyabhat, Khurusbod, Jamgaon, Kohkabod, Budhwara, Basin, Deokar Tumdipar, Bagdumar Budera, Kamkawada and Sonpander gets the advantage of irrigation facility.
Proceed Studying